Line 350 — Installation Guide
Line 350
Installation guide
Units in mm
Specifications
Dimensions350 × 112 × 40 mm
Hardware3M™ VHB™ mounting tape
MaterialAluminium 3 mm
FinishPowder coat, matte
Weight0.45 kg
Fixing surfaceConcrete, brick, drywall, tile
Load capacityUp to 2 kg
OriginDesigned & manufactured in Greece
Before you start
Plan the position before applying — the VHB bond reaches full strength quickly and is not easily repositioned. Have ready: a clean cloth, isopropyl alcohol (recommended), a pencil, and a spirit level.
Not recommended for installation inside shower booths — direct water contact, steam and temperature swings compromise the adhesive bond over time.
Surface preparation
Clean the wall thoroughly with isopropyl alcohol or warm soapy water.
Allow the surface to dry completely — at least 10 minutes.
Mark the intended position with a light pencil mark.
Use a spirit level to confirm horizontal alignment.
Installation
Peel the protective backing from the VHB tape on the back of the shelf.
Position the shelf carefully — align with your marks.
Press firmly across the entire mounting strip for 30 continuous seconds.
Do not move or adjust the shelf after pressing.
Cure time
24 hoursBefore exposing to water or moisture
48 hoursBefore light loading
72 hoursBefore reaching maximum 2 kg load
Care
CleaningWipe with a damp cloth. Avoid abrasive cleaners or steel wool.
ScratchesAvoid sharp objects across the surface to preserve finish.