Line 350 — Installation Guide

Line 350

Installation guide


Line 350 technical drawing — front, isometric and side views with dimensions

Units in mm

Specifications


Dimensions350 × 112 × 40 mm
Hardware3M™ VHB™ mounting tape
MaterialAluminium 3 mm
FinishPowder coat, matte
Weight0.45 kg
Fixing surfaceConcrete, brick, drywall, tile
Load capacityUp to 2 kg
OriginDesigned & manufactured in Greece

Before you start


Plan the position before applying — the VHB bond reaches full strength quickly and is not easily repositioned. Have ready: a clean cloth, isopropyl alcohol (recommended), a pencil, and a spirit level.

Not recommended for installation inside shower booths — direct water contact, steam and temperature swings compromise the adhesive bond over time.

Surface preparation


Clean the wall thoroughly with isopropyl alcohol or warm soapy water.
Allow the surface to dry completely — at least 10 minutes.
Mark the intended position with a light pencil mark.
Use a spirit level to confirm horizontal alignment.

Installation


Peel the protective backing from the VHB tape on the back of the shelf.
Position the shelf carefully — align with your marks.
Press firmly across the entire mounting strip for 30 continuous seconds.
Do not move or adjust the shelf after pressing.

Cure time


24 hoursBefore exposing to water or moisture
48 hoursBefore light loading
72 hoursBefore reaching maximum 2 kg load

Care


CleaningWipe with a damp cloth. Avoid abrasive cleaners or steel wool.
ScratchesAvoid sharp objects across the surface to preserve finish.